A new building site: the safety coordinator and safety plan duties, before day one

Sites open in Poland and the Czech Republic. Research who appoints the safety coordinator, prepares the safety plan and notifies the inspectorate.

Get started free
EHS lead in an orange softshell jacket holding a printed site safety plan on a clipboard beside stacked formwork

This task, run in azta

azta
Two sites starting in March: a distribution centre in Ostrava and a school in Katowice. About eight subcontractors each, peak over forty workers, eleven months.
PL · CZ · EU
Researching

Searching EUR-Lex · Curia

Searching Dziennik Ustaw

Searching e-Sbírka

The EU frame for temporary sites. The directive on temporary or mobile construction sites requires safety and health coordinators where more than one contractor is present, a safety and health plan before the site is set up, and prior notice to the authority for sites above set duration and workforce thresholds.
Czech Republic: the client appoints the coordinator. Czech law puts the duty to appoint a safety coordinator on the client where more than one contractor will work on site, and requires notice of the start of works to the labour inspectorate for larger sites.
Poland: the site manager prepares the plan. Polish building law makes the site manager responsible for preparing the safety and health protection plan, based on the designer’s safety information. Who sends the prior notice for a larger site is a point the research confirms.
The plan has to stay current. The safety plan must be adjusted as the works progress and contractors change. Keeping it current, and being able to show that it was, is part of the duty.
Draft the internal note
site-safety-plan-duties.docx
Regenerate
Export
Word (.docx)PDF
Share

Ostrava and Katowice: safety duties before start of works

Ostrava. The developer, as client, appoints a safety coordinator for the preparation and the works, and ensures the safety plan is prepared. Notice of the start of works goes to the regional labour inspectorate before work begins. Owner: the client’s project manager, supported by our site manager.

Katowice. Our site manager prepares the safety and health protection plan before the site is set up, using the designer’s safety information. Prior notice to the labour inspectorate is required given the size and length of the works; we are confirming whether the investor or we send it. Owner: site manager, reviewed by the EHS lead.

Both sites. Update the plan whenever a new subcontractor starts or a method changes, and keep each version. Record coordination meetings and site inductions in the site diary.

Sources · EUR-Lex · Curia · Dziennik Ustaw · e-Sbírka
Saved

A replay of this page’s example. In azta every line of the answer carries a citation that opens the provision itself.

The situation

A new construction site with several contractors

A contractor opens two sites next spring: a distribution centre in Ostrava and a school in Katowice. Each will have around eight subcontractors, peaks of over forty workers and a build of eleven months. The project director wants one page per site saying who must do what on safety before the first excavator arrives.

The EU directive sets a common frame. National law decides who carries each duty: the client, the designer, the site manager or a coordinator. The hours go on pinning each duty to a person and a deadline in two systems that allocate them differently.

What the research has to settle

The rules behind the answer

The EU frame for temporary sites
The directive on temporary or mobile construction sites requires safety and health coordinators where more than one contractor is present, a safety and health plan before the site is set up, and prior notice to the authority for sites above set duration and workforce thresholds.
Czech Republic: the client appoints the coordinator
Czech law puts the duty to appoint a safety coordinator on the client where more than one contractor will work on site, and requires notice of the start of works to the labour inspectorate for larger sites.
Poland: the site manager prepares the plan
Polish building law makes the site manager responsible for preparing the safety and health protection plan, based on the designer’s safety information. Who sends the prior notice for a larger site is a point the research confirms.
The plan has to stay current
The safety plan must be adjusted as the works progress and contractors change. Keeping it current, and being able to show that it was, is part of the duty.

How it runs in azta

From the question to the document

The question, as you would type it

Two sites starting in March: a distribution centre in Ostrava and a school in Katowice. About eight subcontractors each, peak over forty workers, eleven months. Who must appoint the safety coordinator, prepare the safety plan and notify the labour inspectorate in each country, and by when?
  1. You start with

    A new construction site with several contractors

  2. 01

    Describe the sites

    Give the location, duration, number of contractors and peak workforce. azta searches the EU directive and the Polish and Czech building and safety legislation.

    Cited research· Free
  3. 02

    Draft the note per site

    Ask for one page per site: duty, who carries it, by when and the provision. Edit it in Canvas and add your owners.

    Canvas · Ask azta· Pro
  4. 03

    Check each duty against the statute

    Open each citation in the reader, in Polish or Czech, to confirm who the law names before you assign an owner.

    Atlas statute reader
  5. 04

    Export for sign-off

    Export the note to Word for the project director and keep the research for the site file.

    Word export· Pro
  6. You send

    An internal note of the statutory safety-coordination and safety-plan duties, with owners

What you get

An internal note of the statutory safety-coordination and safety-plan duties, with owners

Internal note · draft

Ostrava and Katowice: safety duties before start of works

Ostrava. The developer, as client, appoints a safety coordinator for the preparation and the works, and ensures the safety plan is prepared. Notice of the start of works goes to the regional labour inspectorate before work begins. Owner: the client’s project manager, supported by our site manager.

Katowice. Our site manager prepares the safety and health protection plan before the site is set up, using the designer’s safety information. Prior notice to the labour inspectorate is required given the size and length of the works; we are confirming whether the investor or we send it. Owner: site manager, reviewed by the EHS lead.

Both sites. Update the plan whenever a new subcontractor starts or a method changes, and keep each version. Record coordination meetings and site inductions in the site diary.

Illustrative excerpt. A real draft is built from your facts and cites the provisions it relies on.

Outcomes on your numbers

What azta is worth on this task

Pro pays for itself after

20 minutes a month

At €85 an hour, that is all the time Pro (€27 a month) has to take off your desk to cover its price.

Example figures. Replace them with your own.

10%50%
Hours back a year
36
Capacity at your rate
€3,060
More site safety-duty notes a quarter
1.5
Return on Pro
9.4×
Hours a year on this task
Today144 h
Your scenario108 h
  • Research
  • Drafting
  • Your review

A scenario you set, not a promise. The hours that come back go to another client, or deeper into this one.

Want these numbers on your team’s real workload?

Book a demo

Sources azta searches here

  • EUR-Lex · Curia
  • Dziennik Ustaw
  • e-Sbírka
See the full source register

What stays with you

  • The technical content of the safety plan, which needs your site team.
  • Labour inspectorate guidance and standards, which azta does not hold.
  • Appointing the people and signing off the note.

Frequently asked questions

Does azta hold labour inspectorate guidance?
For most countries it holds the legislation and EU law, not the inspectorates’ guidance. It shows what it cites, so you can see where guidance still needs checking.
Can it write the safety plan itself?
No. It sets out the statutory duties and drafts the note. The plan’s content depends on the site, the methods and your team’s assessment.
Can I reuse the note for the next site?
Yes. Ask the same question with the new site’s facts. On Enterprise, save the note as a template so every site starts from the same structure.

Book a demo

See the internal note built from your own case.

A working session, not a slide deck. Bring a live matter and see azta research it and draft the document, with your team in the room.

  1. 1

    Bring a real question

    One from this week, with the facts you would give a colleague.

  2. 2

    We run it in azta with you

    You watch the research and open the citations against the provision.

  3. 3

    You see the draft it produces

    Then we plan a trial with your team, if it fits your work.

  • Client data is never used for training
  • Data stays in the EU/EEA
  • Shared workspaces, templates and SSO on Enterprise

Rather try it on your own first? Five questions a month are free, no card.

Scheduling runs on Cal.com, which sets its own cookies, so we have not loaded it. Load the scheduler for this visit?

More use cases