An installation enters the EU ETS: the monitoring and reporting duties

A new boiler brings a German paper mill into the EU emissions trading system. Research the permit, monitoring, verified report and surrender duties.

Get started free
EHS lead in a navy boiler suit holding a printed monitoring plan beside a gas meter skid in a plant room

This task, run in azta

azta
Paper mill in Saxony installing a new gas-fired boiler that takes total rated thermal input above the ETS threshold.
EU · DE
Researching

Searching EUR-Lex · Curia

Searching Gesetze im Internet

A permit and an approved monitoring plan. An installation carrying out an activity listed in the ETS Directive needs a greenhouse gas emissions permit, and its monitoring plan must be approved by the competent authority. In Germany, the German Emissions Trading Authority approves the plan.
Monitoring follows the EU regulation. The Monitoring and Reporting Regulation sets how emissions are monitored, the tiers of accuracy and the rules for changing the plan. Significant changes to the monitoring plan need the authority’s approval.
A verified report every year. Each year’s emissions report must be verified by an accredited verifier under the Accreditation and Verification Regulation and submitted by 31 March of the following year.
Surrender, then compliance. The operator surrenders allowances equal to its verified emissions. Since the 2023 revision of the directive, the deadline is 30 September, and failing to surrender triggers a fixed excess-emissions penalty per tonne.
Draft the internal note
ets-monitoring-reporting.docx
Regenerate
Export
Word (.docx)PDF
Share

Entering the EU ETS: duties and annual calendar for the mill

Before start-up. Apply for the emissions permit and submit the monitoring plan for approval, with the evidence on meters and calculation methods. Check whether the mill can apply for free allocation as a new entrant and, if so, by when. Owner: EHS lead with the energy manager.

Every year. Monitor emissions under the approved plan. Have the report verified and submit it by 31 March. Surrender allowances for the previous year’s emissions by 30 September. Owner: energy manager, with finance holding the registry account.

Changes. Any change to the boilers, fuels or meters is checked against the monitoring plan before it happens, and significant changes are submitted for approval first.

Sources · EUR-Lex · Curia · Gesetze im Internet
Saved

A replay of this page’s example. In azta every line of the answer carries a citation that opens the provision itself.

The situation

An installation entering the EU emissions trading system

A paper mill in Saxony is replacing its boilers with a larger gas-fired unit, which takes the site’s total rated thermal input above the threshold for the EU emissions trading system. The site director wants to know what changes: permits, plans, reports and the yearly cycle of allowances.

The rules sit in three layers: the EU directive and regulations, German law and the authority’s guidance. The hours go on putting the obligations in order, from the permit and monitoring plan to the verified report and the surrender, with a date and an owner for each.

What the research has to settle

The rules behind the answer

A permit and an approved monitoring plan
An installation carrying out an activity listed in the ETS Directive needs a greenhouse gas emissions permit, and its monitoring plan must be approved by the competent authority. In Germany, the German Emissions Trading Authority approves the plan.
Monitoring follows the EU regulation
The Monitoring and Reporting Regulation sets how emissions are monitored, the tiers of accuracy and the rules for changing the plan. Significant changes to the monitoring plan need the authority’s approval.
A verified report every year
Each year’s emissions report must be verified by an accredited verifier under the Accreditation and Verification Regulation and submitted by 31 March of the following year.
Surrender, then compliance
The operator surrenders allowances equal to its verified emissions. Since the 2023 revision of the directive, the deadline is 30 September, and failing to surrender triggers a fixed excess-emissions penalty per tonne.

How it runs in azta

From the question to the document

The question, as you would type it

Paper mill in Saxony installing a new gas-fired boiler that takes total rated thermal input above the ETS threshold. What do we need before start-up, and what are the annual monitoring, reporting, verification and surrender duties and deadlines under the ETS Directive and German law?
  1. You start with

    An installation entering the EU emissions trading system

  2. 01

    Describe the installation

    Give the activity, the rated thermal input, the fuels and the start-up date. azta searches the ETS Directive, the EU monitoring and verification regulations and the German emissions trading act.

    Cited research· Free
  3. 02

    Read the provisions

    Open each cited provision in the reader, with its in-force status, to confirm the thresholds and deadlines that apply.

    Atlas statute reader
  4. 03

    Draft the duty note and calendar

    Ask for a note in two parts, before start-up and every year, with an annual calendar and owners. Edit it in Canvas.

    Canvas · Ask azta· Pro
  5. 04

    Export for the site director

    Export the note to Word and keep the research with the compliance file.

    Word export· Pro
  6. You send

    A note of the monitoring, reporting and surrender duties, with the annual calendar

What you get

A note of the monitoring, reporting and surrender duties, with the annual calendar

Internal note · draft

Entering the EU ETS: duties and annual calendar for the mill

Before start-up. Apply for the emissions permit and submit the monitoring plan for approval, with the evidence on meters and calculation methods. Check whether the mill can apply for free allocation as a new entrant and, if so, by when. Owner: EHS lead with the energy manager.

Every year. Monitor emissions under the approved plan. Have the report verified and submit it by 31 March. Surrender allowances for the previous year’s emissions by 30 September. Owner: energy manager, with finance holding the registry account.

Changes. Any change to the boilers, fuels or meters is checked against the monitoring plan before it happens, and significant changes are submitted for approval first.

Illustrative excerpt. A real draft is built from your facts and cites the provisions it relies on.

Outcomes on your numbers

What azta is worth on this task

Pro pays for itself after

18 minutes a month

At €95 an hour, that is all the time Pro (€27 a month) has to take off your desk to cover its price.

Example figures. Replace them with your own.

10%50%
Hours back a year
22
Capacity at your rate
€2,052
More ETS compliance notes a quarter
0.8
Return on Pro
6.3×
Hours a year on this task
Today84 h
Your scenario62 h
  • Research
  • Drafting
  • Your review

A scenario you set, not a promise. The hours that come back go to another client, or deeper into this one.

Want these numbers on your team’s real workload?

Book a demo

Sources azta searches here

  • EUR-Lex · Curia
  • Gesetze im Internet
See the full source register

What stays with you

  • The technical monitoring methods and the meter evidence.
  • The authority’s guidance and templates, which azta does not hold.
  • Buying and surrendering allowances.

Frequently asked questions

Does azta hold the German authority’s ETS guidance?
No. It holds the ETS Directive, the EU monitoring and verification regulations and the German legislation, not the authority’s guidance and templates. Check those alongside the cited law.
Does it cover the new emissions trading for buildings and transport?
Yes, as legislation. Ask about it separately: it applies to fuel suppliers rather than to installations like the mill.
Can it write the monitoring plan?
No. It sets out what the regulation requires the plan to contain. The plan itself is prepared by your team on the authority’s templates.

Book a demo

See the internal note built from your own case.

A working session, not a slide deck. Bring a live matter and see azta research it and draft the document, with your team in the room.

  1. 1

    Bring a real question

    One from this week, with the facts you would give a colleague.

  2. 2

    We run it in azta with you

    You watch the research and open the citations against the provision.

  3. 3

    You see the draft it produces

    Then we plan a trial with your team, if it fits your work.

  • Client data is never used for training
  • Data stays in the EU/EEA
  • Shared workspaces, templates and SSO on Enterprise

Rather try it on your own first? Five questions a month are free, no card.

Scheduling runs on Cal.com, which sets its own cookies, so we have not loaded it. Load the scheduler for this visit?

More use cases